- GPA ANNOUNCED PLANS TO BUILD SECOND LANDER BRIDGE IN THE GAMBIA
- HOW CAMEROON AVIATION SAFETY KEEPS IMPROVING BUT FALLING SHORT OF INTERNATIONAL STANDARD
- NWSC SET TO IMPROVE WATER INFRASTRUCTURE IN UGANDA
- CHINESE FIRM TO EMBARKED ON SEWERAGE SYSTEM PROJECT IN RWANDA
- TOGO GOVT. LAUNCHED TUTUDO PROGRAM TO TRAIN 500 PEOPLE ON ENERGY-RELATED PROFESSIONS
TOGO HOTEL SET PACE WITH 500KWC SOLAR POWER PLANT INSTALLATION
Hotel Sarakawa in Togo is getting into a full energy transition to solar, with the installation of a photovoltaic power plant of 500 kilowatt-peak (KWC). The solar power plant which will cost 496 million CFA francs will be deployed over an area of 4,000 square meters, dressing the roof of the hotel’s main building with 1,224 photovoltaic panels, each acting as a generator of renewable energy. The infrastructure was inaugurated by the flagship of the…
Read More